Blog 3: Completed project ‘ATN South Carolina’
The machines were installed and commissioned in South Carolina. Therefore this project has come to an end.Completed and in operation
At the end of December 2014 the machines were tested and approved by the UL. The UL certified that everything was in accordance with the EPA requirements.
We took some photographs of the machines in the recycling plant. Both machines are capable of feeding directly into a catalytic converter or condensing the refrigerant and storing it in an 800 liter tank.